Cable Guide Triple head Spot Welding Machine (25kw*3)
CH-10-09
1 set
Shenzhen Sea Port of China
Quantity
- welding machine is for spot welding the combination of cable guide and frame tube.
- Place of Origin:China
- Function:Spot welding
- Application:Round tube and multi-shape tube
- Processing diameter:Dia meter 25~120 mm
- Processing length:no limited
- Operation mode:Semi-automatic
- Control method:Special circuit control box
- Start mode:Pedal switch
- Hydraulic working pressure:0.3~0.4 MPa
- Max. system pressure:0.6 MPa

SHENZHEN CYCLEMAKER TECHNOLOGY CO.,LTD | ||||||||||
Production Introduction | ||||||||||
Cable Guide Triple head Spot welding machine (25kw×3) | Model :CH-10-09 | |||||||||
Description: | ||||||||||
1. welding machine is a special equipment for spot welding the combination of cable guide and frame tube and suitable for varous shape of bicycle tube; | ||||||||||
2. Equipment simple adjustment, fast change mold, high efficiency, stable performance. | ||||||||||
3. It adopt air cylinder to control locking and releasing of the welding mould; welding time and current was controlled by adjusted data. | ||||||||||
4. Simple size of mould which can be customized. | ||||||||||
ITEMS | VALUE | |||||||||
Function | Spot welding | |||||||||
Application | Round tube and multi-shape bicycle tube | |||||||||
Processing diameter | Φ25~Φ120 mm | |||||||||
Processing length | no limited | |||||||||
Capacity | 300~500 PCS/HR | |||||||||
Operation mode | Semi-automatic | |||||||||
Power | 75 KW | |||||||||
Voltage | 2P 380V 50Hz | |||||||||
Control method | Special circuit control box | |||||||||
Start method | Pedal switch | |||||||||
Pneumatic working pressure | 0.3~0.4 MPa | |||||||||
Max. working pressure | 0.6 MPa | |||||||||
Color | Green | |||||||||
Size | 1200×1200×1600 mm | |||||||||
Weight | 700 KG | |||||||||
Products Description

Product Code | CH-10-09 Cable Guide Triple head Spot welding machine (25kw×3) |
Place of Origin | Shenzhen,China |
Brand Name | New Canghai |
Certification | ISO9001,ISO14001,CE |
MOQ | 1 SET |
Supply Ability | 100SETS/Month |
Packaging | Protective film/Pollywood Case/Container |
Shipping Port | Shenzhen Sea Port of China |
Trade Terms | FOB CFR CIF |
Lead time | 15 working days for mold. |
45 working days for machine after receiving deposit | |
Total Employees | 200 |
Payment term | 30% T/T in advance, 70%balance paid before arranging shipment., Western Union or LC at sight |
Shipping Terms | 20'GP container ,40'GP container, 40'HQ container,LCL by sea |
About Us






