Seat Tube Slot Punching Machine
CH-20-04A
1 set
Shenzhen Sea Port of China
Quantity
- bicycle punching machine of bicycle frame is used for punching slot on round tubes, it's suitable for many size of tubes.
- Place of Origin:China
- Function:Punching slot
- Application:Round tube
- Processing dia.:dia meter max 31.8mm
- Punching length:max. 40 mm
- Tube wall thickness:max. 2.0 mm
- Control method:Relay
- Start mode:Pedal switch
- Air working pressure:0.4~0.6 MPa
- Hydraulic working pressure:5 MPa
- Max.system pressure:7 MPa

Products Description
SHENZHEN CYCLEMAKER TECHNOLOGY CO.,LTD | ||||||||||
Product Introduction | ||||||||||
Seat Tube Slot Punching Machine | Model No.:CH-20-04A | |||||||||
Description: | ||||||||||
1. This machine is used for punching slot on round tubes, it's suitable for many size of tubes. | ||||||||||
2. It is efficient, stable and easy for adjusting and changing molds. | ||||||||||
3. It adopt hydraulic cylinder to promote punching tool forward and backward. The position switch controlls the cylinder stroke. | ||||||||||
4. Punching tool and mold can be customized. | ||||||||||
ITEMS | VALUE | |||||||||
Function | Punching slot | |||||||||
Application | Round tube | |||||||||
Processing dia. | max.Φ31.8 mm | |||||||||
Punching length | max. 40 mm | |||||||||
Tube wall thickness | max. 2.0 mm | |||||||||
Capacity | 400~500 PCS/HR | |||||||||
Operation mode | Semi-auto | |||||||||
Power | 2.2 KW | |||||||||
Voltage | 3P 380V 50Hz | |||||||||
Control method | Relay | |||||||||
Start method | Pedal switch | |||||||||
Hydraulic working pressure | 5 MPa | |||||||||
Max.system pressure | 7 MPa | |||||||||
Color | Green | |||||||||
Size | 850×700×1600 mm | |||||||||
Weight | 400 KG | |||||||||

Product Code | CH-20-04A Seat Tube Slot Punching Machine |
Place of Origin | Shenzhen,China |
Brand Name | New Canghai |
Certification | ISO9001,ISO14001,CE |
MOQ | 1 SET |
Supply Ability | 100SETS/Month |
Packaging | Protective film/Pollywood Case/Container |
Shipping Port | Shenzhen Sea Port of China |
Trade Terms | FOB CFR CIF |
Lead time | 15 working days for mold. |
45 working days for machine after receiving deposit | |
Total Employees | 200 |
Payment term | 30% T/T in advance, 70%balance paid before arranging shipment.,Western Union or LC at sight |
Shipping Terms | 20'GP container ,40'GP container,40'HQ container,LCL by sea |
About Us






