Rear Fork End Parallel Checking Machine
CH-20-16
1 set
Shenzhen Sea Port of China
Quantity
- parallel checking machine of bicycle frame is used for checking and alignment for rear fork ends of frame.suitable for iron frames.
- Place of Origin:China
- Function:Checking and alignment of rear fork ends
- Application:Aluminium
- Distance between fork ends:116~135 mm
- Thickness of fork ends:5~14 mm
- Capacity:150~200 PCS/HR
- Operation mode:Manual
- Power:0.05 KW
- Start method:Button and pedal switch
- Pneumatic system pressure:0.4~0.7 MPa
- Control method:(Magnetic) air valve

SHENZHEN CYCLEMAKER TECHNOLOGY CO.,LTD | ||||||||||
Product Introduction | ||||||||||
| parallel checking machine of bicycle frame | Model No.:CH-20-16 | |||||||||
Description: | ||||||||||
1. parallel checking machine of bicycle frame is used for checking and alignment for rear fork ends of frame.suitable for iron frames. | ||||||||||
2. It is efficient, stable and easy for adjusting and changing molds. | ||||||||||
3. It adopt small cylinder puch the blockes to clamp or release the fork ends, it's controlled the air cylinder to clamp or release B.B shell by pedal switch. | ||||||||||
4. Mold can be customized. | ||||||||||
ITEMS | VALUE | |||||||||
Function | Checking and alignment of rear fork ends | |||||||||
Application | Aluminium | |||||||||
Distance between fork ends | 116~135 mm | |||||||||
Thickness of fork ends | 5~14 mm | |||||||||
Capacity | 150~200 PCS/HR | |||||||||
Operation mode | Manual | |||||||||
Power | 0.05 KW | |||||||||
Voltage | 3P 380V 50Hz | |||||||||
Control method | (Magnetic) air valve | |||||||||
Start method | Button and pedal switch | |||||||||
Pneumatic system pressure | 0.4~0.7 MPa | |||||||||
Color | Gray | |||||||||
Size | 700×1050×1950 mm | |||||||||
Weight | 200 KG | |||||||||
Products Description

Product Code | CH-20-16 Rear Fork End Parallel Checking Machine |
Place of Origin | Shenzhen,China |
Brand Name | New Canghai |
Certification | ISO9001,ISO14001,CE |
MOQ | 1 SET |
Supply Ability | 100SETS/Month |
Packaging | Protective film/Pollywood Case/Container |
Shipping Port | Shenzhen Sea Port of China |
Trade Terms | FOB CFR CIF |
Lead time | 15 working days for mold. |
45 working days for machine after receiving deposit | |
Total Employees | 200 |
Payment term | 30% T/T in advance, 70%balance paid before arranging shipment.,Western Union or LC at sight |
Shipping Terms | 20'GP container ,40'GP container,40'HQ container,LCL by sea |
About Us






