Front Triangle Alignment Machine
CH-20-03
1 set
Shenzhen Sea Port of China
Quantity
- bicycle front triangle alignment machine of bicycle frame
is used for checking and correcting the front triangle of bicycle frame. It's suitabe for universial bicycle and elec-bike frame; - Place of Origin:China
- Function:Welding front triangle assembly
- Application:Round and other shapes of tubes.
- Applicable size:16"~28"Frames
- Operation mode:Manual
- Start mode:Pedal switch
- Air working pressure:0.4~0.6 MPa

SHENZHEN CYCLEMAKER TECHNOLOGY CO.,LTD | ||||||||||
Production Introduction | ||||||||||
| bicycle front triangle alignment machine of bicycle frame | Model No.:CH-20-03 | |||||||||
Description: | ||||||||||
1. bicycle front triangle alignment machine of bicycle frame is used for checking and correcting the front triangle of bicycle frame. It's suitabe for universial bicycle and elec-bike frame; | ||||||||||
2. To check and correct seat tube, head tube, rear fork and other parts to change the gauge and positioning parts accordingly. | ||||||||||
3. It is efficient, stable and easy for adjusting and changing molds. | ||||||||||
4. Gauge tool and positioning parts can be customized. | ||||||||||
ITEMS | VALUE | |||||||||
Function | checking and correcting | |||||||||
Application | front triangle of frame | |||||||||
Central height | 145 mm | |||||||||
Top tube length | max. 700 mm | |||||||||
Seat tube length | 190~600 mm | |||||||||
Capacity | 100~150 PCS/HR | |||||||||
Operation Mode | Manual | |||||||||
Function | 1.5 KW | |||||||||
Voltage | 3P 380V 50Hz | |||||||||
Control method | Magnetic starter | |||||||||
Start method | hand valve | |||||||||
Hydraulic working pressure | 3.5 MPa | |||||||||
Max. system pressure | 7 MPa | |||||||||
Color | Gray | |||||||||
Size | 1220×1220×1650 mm | |||||||||
Weight | 620 KG | |||||||||
Products Description

Product Code | CH-20-03 Front Triangle Alignment Machine |
Place of Origin | Shenzhen,China |
Brand Name | New Canghai |
Certification | ISO9001,ISO14001,CE |
MOQ | 1 SET |
Supply Ability | 100SETS/Month |
Packaging | Protective film/Pollywood Case/Container |
Shipping Port | Shenzhen Sea Port of China |
Trade Terms | FOB CFR CIF |
Lead time | 15 working days for mold. |
45 working days for machine after receiving deposit | |
Total Employees | 200 |
Payment term | 30% T/T in advance, 70%balance paid before arranging shipment.,Western Union or LC at sight |
Shipping Terms | 20'GP container ,40'GP container,40'HQ container,LCL by sea |
About Us






