Tube End Chamfering Machine
CH-10-15J
1 set
Shenzhen Sea Port of China
Quantity
- bicycle chamfering machine of bicycle tube is for chamfering round tube ends, suitable for many kind of chamfering occations.
- Place of Origin:China
- Function:Chamfering tube end
- Application:round tube
- Processing diameter:dia meter 19~50.8 mm
- Processing length:Min.120 mm
- Operation mode:Semi-automatic
- Control method:Relay
- Start mode:Pedal switch and photoelectric switch
- Pneumatic working pressure:0.4~0.6 MPa

SHENZHEN CYCLEMAKER TECHNOLOGY CO.,LTD | ||||||||||
Product Introduction | ||||||||||
Tube End bicycle chamfering machine of bicycle tube | Model:CH-10-15J | |||||||||
Description: | ||||||||||
1.bicycle chamfering machine of bicycle tube is for chamfering round tube ends, suitable for many kind of chamfering occations. | ||||||||||
2. Equipment simple adjustment, fast change mold, high efficiency, stable performance. | ||||||||||
3. It adopt cylinder to promote sliding table to process feeding and return back, the photoelectric switch and timing relay control cylinder forward and backward. | ||||||||||
ITEMS | VALUE | |||||||||
Function | Chamfering tube end | |||||||||
Application | round tube | |||||||||
Processing diameter | Φ19~Φ50.8 mm | |||||||||
Processing length | Min.120 mm | |||||||||
Capacity | 600~800 PCS/HR | |||||||||
Operation mode | Semi-automatic | |||||||||
Power | 1.1 KW | |||||||||
Voltage | 3P 380V 50Hz | |||||||||
Control method | Relay | |||||||||
Start method | Pedal switch and photoelectric switch | |||||||||
Pneumatic system pressure | 0.4~0.6 MPa | |||||||||
Color | Gray | |||||||||
Size | 900×650×1400 mm | |||||||||
Weight | 250 KG | |||||||||
Products Description

Product Code | CH-10-15J Tube End Chamfering Machine |
Place of Origin | Shenzhen,China |
Brand Name | New Canghai |
Certification | ISO9001,ISO14001,CE |
MOQ | 1 SET |
Supply Ability | 100SETS/Month |
Packaging | Protective film/Pollywood Case/Container |
Shipping Port | Shenzhen Sea Port of China |
Trade Terms | FOB CFR CIF |
Lead time | 15 working days for mold. |
45 working days for machine after receiving deposit | |
Total Employees | 200 |
Payment term | 30% T/T in advance, 70%balance paid before arranging shipment.,Western Union or LC at sight |
Shipping Terms | 20'GP container ,40'GP container,40'HQ container,LCL by sea |
About Us






