Rear Fork Ends Assembling & Brazing Machine
CH-20-06
1 set
Shenzhen Sea Port of China
Quantity
- bicycle assembling and brazing machine of bicycle frame is used for assembling rear fork or front fork by welding seat and chain stay with dropouts, front fork with front fork ends.
- Place of Origin:China
- Function:Gas welding
- Application:rear fork
- Fork tube length:Min. 200 mm
- B.B Shell length:Max. 80 mm
- Operation mode:Semi-auto
- Control method:Relay
- Start mode:Press bottun and position switch

SHENZHEN CYCLEMAKER TECHNOLOGY CO.,LTD | ||||||||||
Product Introduction | ||||||||||
Rear Fork Ends Assembling & Brazing Machine | Model No.:CH-20-06 | |||||||||
Description: | ||||||||||
1. This machine is used for assembling rear fork or front fork by welding seat and chain stay with dropouts, front fork with front fork ends. | ||||||||||
2. It is efficient, stable and easy for adjusting and changing molds. | ||||||||||
3. The fire strength was controled by relay. Sensor switch controls pump and fire relay. | ||||||||||
4. With tempering prevent device, safe and long service life. | ||||||||||
ITEMS | VALUE | |||||||||
Function | Gas welding | |||||||||
Application | rear fork | |||||||||
Fork tube length | Min. 200 mm | |||||||||
Capacity | 100~200 PCS/HR | |||||||||
Operation mode | Semi-auto | |||||||||
Power | 0.2 KW | |||||||||
Voltage | 2P 220V 50Hz | |||||||||
Control method | Relay | |||||||||
Start method | Press bottun and position switch | |||||||||
Color | Green | |||||||||
Size | 1400×700×1600 mm | |||||||||
Weight | 250 KG | |||||||||
Products Description

Product Code | CH-20-06 Rear Fork Ends Assembling & Brazing Machine |
Place of Origin | Shenzhen,China |
Brand Name | New Canghai |
Certification | ISO9001,ISO14001,CE |
MOQ | 1 SET |
Supply Ability | 100SETS/Month |
Packaging | Protective film/Pollywood Case/Container |
Shipping Port | Shenzhen Sea Port of China |
Trade Terms | FOB CFR CIF |
Lead time | 15 working days for mold. |
45 working days for machine after receiving deposit | |
Total Employees | 200 |
Payment term | 30% T/T in advance, 70%balance paid before arranging shipment.,Western Union or LC at sight |
Shipping Terms | 20'GP container ,40'GP container,40'HQ container,LCL by sea |
About Us






