Alloy Rim Rolling Machine
CH-80-013
1 set
Shenzhen Sea Port of China
Quantity

SHENZHEN CYCLEMAKER TECHNOLOGY CO.,LTD | ||||||||||
Product Bicycle Rim Machine Introduction | ||||||||||
| Alloy Rim Rolling Machine | Model NO.:CH-80-013 | |||||||||
Bicycle Rim Machine Description: | ||||||||||
1.This kind of Bicycle Rim Machine is used for rolling alloy profiles into round cycles to make Alloy Rim. Bicycle Rim Machine is suitable for single wall , double wall and triple wall Alloy Rim rolling processing work. | ||||||||||
2. Alloy Rim Rolling Machine is efficient, stable and easy for adjusting and changing molds. | ||||||||||
3. Alloy Rim Rolling Machine with 4 rollers, the main three rollers bend an oversized spiral and the fourth roller is correcting the spiral into the required diameter. With this technology, tolerance during bending shall be reduced 0.05mm | ||||||||||
4. This Bicycle Rim Machine mold can be customized. | ||||||||||
| Bicycle Rim Machine | Alloy Rim Rolling Machine | |||||||||
Function | Rolling round alloy profiles | |||||||||
Application | Single, Double and Triple wall Alloy Rim | |||||||||
Dia.of rims | 12"~28" If height of profile is above 40mm, shall choose another machine. | |||||||||
Down mold axles distance | 130 mm | |||||||||
Inner hole dia. of die wheel | Φ45 mm | |||||||||
Capacity | 400~500 PCS/HR of Alloy Rim | |||||||||
Operation Mode | Semi-automatic | |||||||||
POWER | 2.2 KW | |||||||||
Voltage | 3P 380V 50Hz | |||||||||
Control mode | Relay | |||||||||
Start mode | By press button | |||||||||
Color | Customized | |||||||||
Size | 800×700×1750 mm | |||||||||
Weight | 400 KG | |||||||||

| Bicycle Rim Machine | Alloy Rim Rolling Machine |
Place of Origin | Shenzhen,China |
Brand Name | New Canghai |
Certification | ISO9001,ISO14001,CE |
MOQ | 1 SET |
Supply Ability | 100SETS/Month |
Packaging | Protective film/Pollywood Case/Container |
Shipping Port | Shenzhen Sea Port of China |
Trade Terms | FOB CFR CIF |
Lead time | 15 working days for mold. |
45 working days for machine after receiving deposit | |
Total Employees | 200 |
Payment term | 30% T/T in advance, 70%balance paid before arranging shipment.,Western Union or LC at sight |
Shipping Terms | 20'GP container ,40'GP container,40'HQ container,LCL by sea |
About Us






